Production Process

Stage Set – AECC - Nothern Star Awards

1 23

Over the past few years MODUL UK has developed a close business relationship with the AECC Aberdeen Exhibition and Conference Centre. We now not only provide the AECC with our modular system for their shell scheme requirements but also helped develop and manufacture a range of bespoke system stands for shows such as All Energy or Offshore Europe.

AECC

The most exciting challenge however was to design and manufacture a unique fabric back drop for the NOTHERN STAR Awards 2008. From the initial conceptual idea, through to the manufacture and delivery of the fabric back drop, MODUL worked hand in hand with the AECC to deliver a stunning stage set for a successful event.

Stage Set layout - once the design was agreed upon MODUL generated CAD drawings for the system framework.

PDF_pics_Page_1 PDF_pics_Page_2 PDF_pics_Page_3
PDF_pics_Page_4 PDF_pics_Page_5 PDF_pics_Page_6
PDF_pics_Page_7 PDF_pics_Page_8

A parts list of all the components used to manufacture the curved structure was generated.

Delivery_note_Page_1

The profiles where cut, curved, milled or CNC machined and accessories were fitted to complete the system kit for the stage set.

machine_1 machine_2 machine_3 machine_4

A pre-build took place in our German factory to label the individual components and ensure a smooth build in Aberdeen.

prebuild1 prebuild2
prebuild3 prebuild4

The components were crated and shipped direct to the AECC and built by the local crew.

Shipping_1 Shipping_2

Successful event! - Click for video link

You are here: MODUL PRODUCTION PROCESS